Your login status/name: Not Logged in

mainroads logo

 

logo

   

Phurba Yangzom

Last visit date: 08 October 2024
Auditor Information
Auditor Status
Audit Team Trainee
Username (usernames must only include lowercase characters and not include any spaces)
**********
Organisation
Not in List
Public Email
This email address is being protected from spambots. You need JavaScript enabled to view it.
Public Phone
0451341049
Auditor number
1077 (T)
Auditor Location
Metropolitan
LG Area
City of Subiaco
Days Left for CPD Update Course
-739683
Team Leader in Audits:
0
Team Member in Audits:
1
e
{"logintype":"USERNAME","namestyle":"FIRSTNAME_LASTNAME","formatname":"NAME","avatar":"0","status":"0","confirmusermail":"0","passwordstrengthmeter":"0","forcerequired":"0","firstLoginUrl":"","loginUrl":"","profileACL":"2","profileACLcustom":"5","hideempty":"1","tabs":"1","layout":"1","layout_width":"center","layout_maxwidth":"500","layout_form":"vertical","bootstrap":"0","bootstrap_icons":"0","socialconnect_type":"popup","socialconnect_profilelink":"0","socialconnect_profilelink_btnicon":"0","socialconnect_loginlink":"0","socialconnect_loginlink_btnicon":"0","facebook_enabled":"0","facebook_application_id":"","facebook_application_secret":"","twitter_enabled":"0","twitter_consumer_key":"","twitter_consumer_secret":"","google_enabled":"0","google_client_id":"","google_client_secret":"","google_api_key":"","linkedin_enabled":"0","linkedin_api_key":"","linkedin_secret_key":""}

UPLOAD EVIDENCE OF ROAD SAFETY RELATED TRAINING

ROAD SAFETY RELATED TRAINING ATTENDED

Training NameTraining ProviderDurationDate CompletedVerified by RSA Panel
Road Safety Engineering – Treatment of Crash LocationsMain Roads WA / IPWEA2 days23/05/2023
Results 1 - 1 of 1

List submissions - Team Leader in Audits (only applicable for Senior Road Safety Auditors)

Date of AuditLocation TypeStage of AuditProject TypeDetails

Team Leader In Audits Experience Summary

Current 5 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000
Current 10 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor-----
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00000

List submissions - Team Members in Audits if available

Team Member In Audits Experience Summary

Current 5 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor--1--
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00100
Current 10 Years
Project TypeFeasibilityPreliminary DesignDetailed DesignPre/Post openingRoad Safety Inspection
Blackspot project-----
Cycling Facilities-----
Grade Separation-----
Intersection Improvements Major-----
Intersection Improvements Minor--1--
Land Use Development-----
Local Traffic Management Project-----
New Road Project-----
New roundabout-----
Pedestrian Facilities-----
Public Transport Project Major-----
Public Transport Project Minor-----
Road Safety Inspection – Intersection-----
Road Safety Inspection – Route-----
Rural Road Upgrade-----
Rural Route Treatment-----
Safety Barrier Project-----
Shared use Facilities-----
Signalised Intersection-----
Streetscape Works-----
Traffic Calming-----
Unsignalised Intersection-----
Urban Road Upgrade-----
Urban Route Treatment-----
Totals00100

Search